Thursday, March 3, 2011
Teapot 1 & 4 fired
After a blast of the snow last Friday, things calmed down, and fired the kiln on Wednesday. I gave up the bottom two shelves due to oxidation and placed the unglazed ware there last firing. When I was loading this week, I thought using this as a saggar (flip over and used as a cover) to see. It turned out the ware inside the saggar got reduction while other pieces around was oxidized. Funny thing. I did not put anything to help reduction inside the saggar. This needs further testing.
Teapot 1 and 4 are fired. I like both. Come out good.
[caption id="attachment_1421" align="alignnone" width="225" caption="Teapot 1 fired"][/caption]
[caption id="attachment_1422" align="alignnone" width="225" caption="Teapot 4 fired"][/caption]
[caption id="attachment_1423" align="alignnone" width="225" caption="Teapot 9"][/caption]
Flux: Thaw opens tomorrow at 5pm at the Hungerford building. You will pleasantly surprise . It is great show with wide arrays of media.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment